§ 416. In General.  


Latest version.
  • It is recommended that a systematic procedure of construction be followed in order to eliminate any possible disagreements between the department of public works and the proprietor and his agents. In this connection, it is strongly recommended that all public and private underground utilities be installed after the rough grading has been completed.

    Before any building construction is started in an area, all utilities and street construction must be complete on that segment of the system.

    (a)

    Construction on/or of frozen material will not be approved.

    (b)

    Permits must be obtained from the department of public works by the contractor for any construction within the right-of-way of existing city streets.

    (c)

    Inspection by the department of public works shall not relieve the proprietor's engineer of any of his obligations but are to verify the proper construction of the streets in their various stages of construction and to furnish spot inspections during the course of construction.

    (d)

    The proprietor's engineer shall set and check grade and alignment, inspect all materials incorporated in the street and drain construction and supervise and inspect all construction within the street right-of-way and drainage easements.

(Ord. No. 1978-15, 12-11-78)